EMC

Zero upfront cost, maximum performance.

Fund the lighting upgrade from verified energy savings instead of a single capital outlay.

The EMC model allows facilities to fund lighting upgrades through verified energy savings, reducing capital pressure while improving safety and operational control.

Illumination Intelligence starts by auditing existing fixtures, circuits, traffic patterns, and utility data to establish an energy baseline and savings model. We then structure equipment investment, contract duration, and maintenance scope around the site conditions so the upgrade can be funded through verified energy savings.

What the annual carbon reduction is made ofCombined annual CO2e avoided across the 7 selected sites that report a carbon figure.
Annual CO2e avoided, measured sites796t CO2e / year
  • 新竹赤土崎地下停車場168 t
  • 大里運動公園地下停車場194 t
  • 台灣圖書館地下停車場43 t
  • 台南海安路地下停車場206 t
  • 仁愛帝寶地下停車場(收費停車場)25 t
  • 萬華火車站地下停車場110 t
  • 民視 FTV50 t

Tonnage at a single site follows the size of the facility and its operating hours — it is not a restatement of the savings percentage.

View data table
Annual CO2e avoided, by site
SiteLive sinceAnnual CO2e avoidedShare
新竹赤土崎地下停車場Jan 2023168 t21%
大里運動公園地下停車場Feb 2023194 t24%
台灣圖書館地下停車場Apr 202343 t5%
台南海安路地下停車場Aug 2023206 t26%
仁愛帝寶地下停車場(收費停車場)Dec 202325 t3%
萬華火車站地下停車場Jul 2024110 t14%
民視 FTVJul 202550 t6%
衛生福利部台北醫院May 2025
台哥大電信大樓地下停車場Oct 2025
01

Site assessment

Review fixture quantity, illuminance, safety gaps, peak and off-peak usage, and historical electricity data to define zoning, sensing strategy, and expected savings.

02

Savings guarantee

Track pre- and post-installation energy data, tune control logic, and provide reporting that helps owners and managers explain the achieved performance.

03

Shared returns

Upgrade costs can be paid from a portion of electricity savings over the contract period, reducing upfront capital pressure while accelerating modernization.

04

Long-term operations

After launch, the system monitors luminaires, sensors, and controllers with energy reports, alerts, and maintenance guidance to protect long-term savings.

Process

01

On-site assessment

Review fixture count, movement patterns, circuits, and historical electricity data.

02

Execution report and contract

Define savings potential, business model, and deployment scope before work begins.

03

Dedicated installation team

Replace old tubes with smart luminaires without rewiring or complex system changes.

04

Warranty and after-sales service

Provide warranty coverage, maintenance guidance, and energy performance tracking.

Deployment

No rewiring. Plug-and-play lighting upgrade.

Old tubes are replaced with smart luminaires, then lighting modes are tuned for driveways, entrances, and operating patterns to reduce installation disruption.

  • Free installation and warranty can be structured by contract
  • Electricity savings support investment recovery or shared returns
  • On-site mode settings match different facility needs